One session, two views
Set up the pitch and actions in 2D, then watch the same session play through in 3D.
Football intelligence workspace
Design a football session on the pitch, play it back in 3D and review video in one Windows coaching workspace.

Built for the full coaching cycle
Every tool shares the same session, timeline and coaching language.
Set up the pitch and actions in 2D, then watch the same session play through in 3D.
Technical/tactical, physical, psychological and social evidence stays attached to the training or match it came from.
Pair the Windows app with your Football Laboratory account and use the tools included in your plan.
Every stage. One workstation.
Plan the session, simulate the detail, present the idea and record the evidence without leaving the same responsive workspace.
Football LaboratoryPlace players, goals and space markers, aim passes and shots, and sequence the session on one timeline.
Review player movement, goalkeeper actions and the ball in a movable 3D camera view.
Choose local video files and arrange up to four screens alongside the coaching timeline.
Connect training plans, match logs, reports, Team Sync and four-corner performance evidence inside one football workflow station.
Monthly access
Start in 2D for free, equip one coach, unlock every AI capability or bring a full staff into one club plan.
Free
Start designing in 2D and join shared work as a guest.
Coach
2D and 3D coaching workspaces with the complete non-AI toolset.
Coach Pro
Full access to Football Laboratory, including every AI capability.
Club
One complete Football Laboratory plan for a coaching department.